Our Insights

Dynamic Solutions to elevate the buildings, occupants, and communities we serve.
Blog Author
Nicholas Muscolino

Nicholas Muscolino

Kitchen Exhaust Hood Testing and Balancing: FAQ on NFPA 96 Capture Velocity Requirements

Commercial kitchen exhaust hoods are tested by measuring airflow at the hood face and in the grease duct, comparing...

NFPA 92 Smoke Control Testing: What Stairwell Pressurization and Atrium Systems Require

NFPA 92 governs smoke control systems in buildings with stairwell pressurization, atrium smoke exhaust, and zoned smoke...

ASHRAE 188 and Cooling Tower Water Management Plans: What Compliance Testing Requires

ASHRAE 188 compliance for cooling towers means building owners put a written water management plan in place that...

TAB and Commissioning for Data Centers: What Makes Mission-Critical Testing Different

Data center testing, adjusting, and balancing (TAB) and commissioning differ from standard commercial work in one...

ASHRAE 110 Fume Hood Testing: What It Requires and How It's Performed

ANSI/ASHRAE 110 is the national standard that measures how well a laboratory fume hood contains hazardous fumes, using...

ASHRAE 62.1-2025 Is Here: What Changed for Ventilation Rate Verification

ASHRAE published the 2025 edition of Standard 62.1, Ventilation for Acceptable Indoor Air Quality, with the standard's...

IDOH Adopts FGI 2026 Guidelines: What Indiana Hospitals Need to Know By June 1, 2027

The Indiana Department of Health (IDOH) posted its formal adoption notice on September 2, 2026, confirming that the...

How to Choose a TAB Contractor: Questions to Ask Before You Sign

The right TAB contractor holds current certification through an agency like NEBB or TABB, can produce references from...

TAB vs. Commissioning: What's the Difference, and Do You Need Both?

Testing, adjusting, and balancing (TAB) verifies that airflow and water flow through a building's HVAC equipment match...

ASHRAE 90.1's New OR Turndown Mandate: What Hospitals Need to Know

ASHRAE/IES Standard 90.1's Addendum bh, approved April 30, 2025, requires operating rooms, surgical cystoscopy rooms,...
Elevate Your Building.

Take the first step.

Get Your Quote.

Have a need?  We are there for you.  One of our trusted advisors will work to provide a full scope and pricing for your needs.