Our Insights

Dynamic Solutions to elevate the buildings, occupants, and communities we serve.
Expert Articles For

Facility Optimization

Healthcare Ventilation Compliance: Testing to Monitoring

Healthcare ventilation compliance means meeting NFPA 99 and ASHRAE 170 requirements for air pressure, air changes, temperature, and humidity in critical spaces, verifying those conditions through scheduled testing, and increasingly, confirming them around the clock with continuous monitoring instead of only on test day.

Waiting room with reception in medical clinic

ASHRAE 188 and Cooling Tower Water Management Plans: What Compliance Testing Requires

ASHRAE 188 compliance for cooling towers means building owners put a written water management plan in place that...

ASHRAE Restructures Standard 90.1: What the July 2026 Split Means for Energy Compliance

On July 16, 2026, ASHRAE announced it is restructuring Standard 90.1 to keep the standard focused purely on...

TAB and Commissioning for Data Centers: What Makes Mission-Critical Testing Different

Data center testing, adjusting, and balancing (TAB) and commissioning differ from standard commercial work in one...

ASHRAE 110 Fume Hood Testing: What It Requires and How It's Performed

ANSI/ASHRAE 110 is the national standard that measures how well a laboratory fume hood contains hazardous fumes, using...

What Are Building Performance Standards, and Does Your Building Need Retro-Commissioning to Comply?

A Building Performance Standard (BPS) is a local or state law that sets a required energy or emissions target for...

ASHRAE 62.1-2025 Is Here: What Changed for Ventilation Rate Verification

ASHRAE published the 2025 edition of Standard 62.1, Ventilation for Acceptable Indoor Air Quality, with the standard's...

IDOH Adopts FGI 2026 Guidelines: What Indiana Hospitals Need to Know By June 1, 2027

The Indiana Department of Health (IDOH) posted its formal adoption notice on September 2, 2026, confirming that the...

How to Choose a TAB Contractor: Questions to Ask Before You Sign

The right TAB contractor holds current certification through an agency like NEBB or TABB, can produce references from...

The 2027 IECC Is Final: What It Means for TAB and Commissioning Scopes

The International Code Council finalized the 2027 International Energy Conservation Code (IECC) in late August 2026,...

What Is Functional Performance Testing in Commissioning, and How Is It Conducted?

Functional performance testing (FPT) is the stage of the commissioning process where equipment and control sequences...
Elevate Your Building.

Take the first step.

Get Your Quote.

Have a need?  We are there for you.  One of our trusted advisors will work to provide a full scope and pricing for your needs.